2020
Ontario

Sikadur®-22 Lo-Mod FS applied over a Bridge

Caledonia Bridge-Lo-Mod

Caledonia, Ontario

 

Project Details

Details:

  • Location: Caledonia, Ontario
  • Project Date: October 2020
  • Project size: Approx. 545 sq. meters

 

 

Product used: 

Contractor

M2M Construction.

Pictures of the project

Before
Bridge, Caledonia, Before
Bridge before, Caledonia
Product Application
Sikadur-22 Lo Mod FS application
Bridge before, Caledonia
Final Result
Sikadur-22 Lo Mod FS Result
Caledonia Bridge Result