STEP 1 - SPREADING: Pour and spread the EVOLUTION Pro 1 polymeric sand on the paved surface. Important: surface must be completely dry.
STEP 2 - JOINT FILLING: Using a push broom, spread the polymeric sand over the joints making sure to fill to the full depth of the paver, stone or slab, leaving a 3 mm (1/8 in) reveal. NOTE: The manufacturers of some types of pavers recommend the removal of any polymeric sand from the surface of the pavers using a push broom and a leaf blower before proceeding to step 3. Some also recommend to use a vibrating plate machine equipped with a Teflon plate at step 3. Please verify the recommendations of your paver manufacturer before installation.
STEP 3 - COMPACTING: Use a vibrating plate over the entire paver surface for joints less than 6 mm (1/4 in). Repeat steps 1 to 3 if necessary to make sure the joints have been filled to at least 3 mm (1/8 in) below the paver surface.
STEP 4 - SWEEPING & CLEANING: To ensure that no sand sticks to the surface of the pavers, use a stiff bristled broom for the initial sweeping of the EVOLUTION Pro 1 polymeric sand. Then use a soft bristle broom to sweep the excess sand off the surface. Finally, use a leaf blower to ensure the removal of any excess sand residue from the surface. These two cleaning steps are important before proceeding to step 5.
STEP 5 - WATERING / ACTIVATION: Water 5 m² (50 ft²) sections at a time, ensuring your spray nozzle is set to the "shower" position. Always begin the one step watering process from the lowest part of the project. Using the shower head position, generously shower the pavers one time, approximately up to 1 minute per 5 m² (50 ft²) in a left and right motion, while ensuring no displacement of polymeric sand from the joints. It is recommended to check if the water has filtered down to at least 25 mm (1 in) of the depth of the joints. To do this, simply use a screwdriver and lift up the sand, then pack-it back in to it’s original position.
STEP 6 - DRYING/SETTING: Remove any standing water from the surface of the paver with a leaf blower. For optimum performance, a minimum of 24 hours is required to allow the polymer sand to cure and harden properly. Do not walk or drive on the paved surface during this period. The curing and hardening process will take much longer in cold, damp weather. The longer the curing time, in dry and warm conditions, the better and more durable the final result will be. Use this product at temperatures over 0 °C (32 °F). In case of unexpected rainfall during the drying period, we recommend temporarily covering the area with a tarp and removing it after rain stops.