The damages caused by operations are typically surface damages from traffic, chemical exposure, or impact resulting in spalls, erosion and/or cracks. Sometimes a crack in slab-on-ground can be caused by a failure of the subgrade or the ground conditions have changed after the construction. Most surface damages can be repaired with a resurfacing materials